How to Apply for GEPCO new connection?

GEPCO (Gujranwala Electric Power Company) is one of Pakistan’s main electricity distribution companies, operating under WAPDA. It supplies electricity to Gujranwala and surrounding areas including Sialkot, Narowal, Hafizabad, Mandi Bahauddin, and Gujrat.

For anyone living or doing business in these areas, GEPCO new connection is the official way to get electricity for a property.

How to Apply for GEPCO New Connection?

Applying for a new electricity connection from GEPCO involves a step-by-step process. The application is submitted through the Electricity New Connection (ENC) system provided by WAPDA.

Visit ENC Official Website

  • Go to the ENC (Electricity New Connection) Portal at enc.com.pk.
  • Select GEPCO from the list of electricity distribution companies.

Fill in the Online Application Form

You’ll need to provide details such as:

  • Applicant’s name and CNIC
  • Father’s/Husband’s name
  • Contact number and email
  • Property address where connection is required
  • Type of connection (domestic, commercial, or industrial)
  • Load requirement (in kW)

Upload Required Documents

Make sure to scan and upload all necessary documents. Typically, GEPCO requires:

  • Copy of applicant’s CNIC
  • Proof of ownership (Registry / Fard / Allotment letter)
  • Undertaking form (available on the portal)
  • Neighbor’s reference number (for verification)
  • Attested Affidavit (if required)

Submit the Application

  • After completing the form and attaching documents, submit your application.
  • You will receive a tracking ID to check the progress of your request online.

Print and Sign the Application

  • Download the application form after submission.
  • Sign it and attach the required hard copies of documents.
  • Submit them to your nearest GEPCO office for further processing.

Demand Notice (DN)

Once your application is verified, GEPCO will issue a Demand Notice. This is the fee you must pay to proceed.

  • Pay the Demand Notice at the designated bank.
  • Keep the paid receipt as proof.

Verification & Meter Installation

  • After payment verification, GEPCO will schedule a site inspection.
  • Finally, a meter will be installed at your premises, and your new GEPCO connection will become active.

Documents Required for GEPCO New Connection

Here’s a checklist of the important documents you’ll need:

  • Copy of applicant’s CNIC
  • Proof of property ownership (Registry, Allotment, or Fard)
  • Attested Affidavit by the applicant
  • Undertaking form (download from portal)
  • Neighbor’s electricity bill copy/reference number
  • Permission letter from landlord (if rented property)

GEPCO New Connection Fee

The GEPCO connection fee varies depending on:

  • Type of connection (domestic, commercial, industrial)
  • Load requirement (in kW)
  • Service length (distance from existing supply line)

You can check the latest fee structure on the official GEPCO or ENC website.

How to Track GEPCO New Connection Application?

You can easily track your application online:

  1. Visit the ENC tracking page.
  2. Enter your tracking ID.
  3. Check the current status of your application (pending, approved, or installed).

GEPCO New Connection Process

  • Ensure all documents are valid and attested.
  • Double-check your application form before submission.
  • Pay the Demand Notice fee on time to avoid delays.
  • Keep copies of all submitted documents and receipts.

Applying for a GEPCO new connection in Pakistan is a straightforward process if you carefully follow each step. From filling the online application to paying the Demand Notice and submitting documents, the procedure is designed to make electricity access easier for households and businesses.

If you’re from Gujranwala, Sialkot, Gujrat, or nearby areas, make sure you apply through the official ENC portal to avoid scams or delays.

With this guide, you now know exactly how to apply for GEPCO new connection and track it until installation.